The new systems automate the replenishment of printing systems with processed SLS powder, closing the gap that previously existed between powder preparation and printer powder supply.
The Series D financing will initiate the production and manufacturing of Titan, ICON's multi-story robotic construction system, at the ICON factory located in Austin, Texas.
AMAZEMET has signed a Memorandum of Understanding (MoU) with Fusion for Energy (F4E), the EU organisation responsible for Europe's contribution to ITER and other major fusion projects.
Three of the four price classes that CONTEXT uses to categorise 3D printers saw higher unit shipment volumes in Q2 2026 than in the same period last year.
Acquired via SYS Systems, the Wythenshawe-based company is said to have reduced operational costs and sped up cycle times since installing the 3D printing system.